Services
Product Development & Sampling
A production run is only as good as the sample it was approved against. Most “the bulk order didn’t match the sample” complaints actually trace back to a step before that — a sample that was approved without a written tech pack behind it, so “close enough” became the standard nobody agreed to in writing.
From Sketch To Sample
You do not need a finished tech pack to start. A sketch, a reference garment you already like, or even a rough description of what you want is enough to begin. What we build from there:
Fabric and trim sourcing
Fabric and trim sourcing, with physical swatch options rather than a fabric name and a guess
A written tech pack
A written tech pack, so measurements, construction details, and finish are on paper, not just understood verbally
Proto sample
Proto sample — the first physical version, used to catch obvious issues early
Fit sample
Fit sample — checked against your size chart and grading
Pre-production sample
Pre-production sample — the version bulk cutting is actually measured against
Why Sampling Takes The Time It Does
Average sampling turnaround runs 10 to 15 days. That is not padding — it’s the time needed to source fabric, cut and sew a proto, get your feedback, and revise before a pre-production sample is worth approving. Rushing this stage is exactly where “the bulk shipment didn’t match the sample” problems start.
Private Label Development
For private label clothing sourcing specifically, product development also includes where your branding physically goes — woven labels, neck prints, hang tags, and packaging — developed alongside the garment sample rather than added as an afterthought once production is already underway. See Private Label & Low-MOQ for how branding and minimums work together.
frequently asked questions
FAQ
Start Your First Production Run
Tell us your product, and we’ll tell you if pieces is realistic for it — and what it will cost.
